Posted on Leave a comment

Building A Bridge

I needed a way to cross this stream that my waterwheel is built across a little bit upstream, primary vehicles across the bridge were my Deere 314 garden tractors along with foot traffic and a wheelbarrow. I built this bridge using this most simple construction method, sadly(fortunately) the stream was short enough that I couldn’t build a more complex bridge. A flat bridge with no handrails also presented the cheapest construction method and because I didn’t need handrails I only made it wide enough for garden tractor tires to fit.

Originally I wanted to build a Da Vinci bridge lke this one: http://mathemati.ca/1_7foot.html but even that would have been too long.

Leave a Reply